What is an Arboricultural Method Statement and Tree Protection Plan?

A Tree Protection Plan (TPP) is a scale drawing showing the trees to be retained, their root protection areas, and exactly where protective fencing and ground protection will go to create a construction exclusion zone around them.

An Arboricultural Method Statement (AMS) is the written document that goes with it. It explains how any work that could affect retained trees will be carried out, and in what order. This includes installing and removing protective fencing, demolition, excavation near trees, no-dig surfacing, routing services, any necessary pruning, and site storage and access. It also sets out who is responsible for what, and whether arboricultural supervision is needed at key stages.

Together, they give the council confidence that retained trees will survive the development, and give contractors clear instructions to follow on site.

01 — Tell us about your project

Send the site address, plans and details of the proposed work

02 — Receive a quotation

We confirm the required service, scope, fee and timescale

03 — Site survey

The site is inspected and relevant tree data recorded

04 — Report & plans

Your arboricultural method statement and Tree Protection Plan are issued

Measuring a tree's stem diameter, which sets the root protection area in an arboricultural method statement

Arboricultural Method Statements & Tree Protection Plans

Clear, practical documents that show how retained trees will be protected before, during and after construction.

When do you need one?

– When your local planning authority asks for them as part of a planning application where trees are being retained near the works
– When a planning condition requires a Tree Protection Plan and/or Arboricultural Method Statement to be submitted and approved, often before any work, including demolition or site clearance, starts
– When you want to protect valuable trees during building work, even where planning permission isn’t needed

What’s included

– A Tree Protection Plan drawn over your proposed layout, showing protective barriers, ground protection and construction exclusion zones
– Specification of protective fencing and ground protection in line with BS 5837:2012
– Site-specific methods for any work within or near root protection areas, such as hand digging, no-dig surfacing, specialist foundations and service routes
– Recommended timing and sequence of tree protection measures
– Any tree works needed to allow development, such as removals or pruning for access and clearance
– Arrangements for arboricultural supervision and monitoring where needed (see Site Supervision & Watching Briefs)

What you’ll receive

A Tree Protection Plan drawing and a written Arboricultural Method Statement, prepared for submission with a planning application or to discharge a planning condition.

We prepare arboricultural method statements and tree protection plans for sites mainly across Essex and Suffolk, from single plots to larger developments, and we’re happy to attend sites throughout the UK without penalising clients for distance. See the areas we cover.

Frequently asked questions

My planning permission has a tree condition. What do I need to do?

Read the condition wording carefully. Many tree conditions must be met before work starts on site, including demolition and site clearance. Send us the decision notice and we’ll prepare the documents required so you can apply to the council to discharge the condition. Starting work before a pre-commencement condition has been discharged can put your permission at risk and lead to enforcement action.

What is a root protection area?

The root protection area (RPA) is the minimum area around a tree that should be left undisturbed to protect its roots and the soil they grow in. Under BS 5837:2012 it is normally calculated as the area of a circle with a radius 12 times the stem diameter (measured 1.5 m above ground for single-stemmed trees). It can be adjusted in shape where site conditions mean roots are likely to be distributed unevenly.

What kind of fencing is needed?

BS 5837:2012 recommends a robust barrier: typically welded mesh panels on a braced scaffold framework, fixed so that they can’t easily be moved. A lighter specification may be acceptable in some lower-risk situations. The Tree Protection Plan will specify what is appropriate for your site, along with any temporary ground protection where access over root areas is needed.

Can we build or lay paving within a root protection area?

Sometimes. Where it can be justified, methods such as no-dig cellular confinement surfacing, pile-and-beam or raft foundations, and hand or air-spade excavation can reduce harm to roots. The AMS sets out exactly how this will be done.

Do I need someone on site during construction?

Not always, but many AMSs include supervision at key stages, such as checking fencing before work starts or overseeing digging near trees. Councils often require written records of this. We can provide it through our Site Supervision & Watching Briefs service.